Stochastic Project Networks
Temporal Analysis, Scheduling and Cost Minimization
Series: Lecture Notes in Economics and Mathematical Systems; 344;
- Publisher's listprice EUR 53.49
-
22 184 Ft (21 128 Ft + 5% VAT)
The price is estimated because at the time of ordering we do not know what conversion rates will apply to HUF / product currency when the book arrives. In case HUF is weaker, the price increases slightly, in case HUF is stronger, the price goes lower slightly.
- Discount 20% (cc. 4 437 Ft off)
- Discounted price 17 748 Ft (16 902 Ft + 5% VAT)
Subcribe now and take benefit of a favourable price.
Subscribe
22 184 Ft
Availability
Estimated delivery time: In stock at the publisher, but not at Prospero's office. Delivery time approx. 3-5 weeks.
Not in stock at Prospero.
Why don't you give exact delivery time?
Delivery time is estimated on our previous experiences. We give estimations only, because we order from outside Hungary, and the delivery time mainly depends on how quickly the publisher supplies the book. Faster or slower deliveries both happen, but we do our best to supply as quickly as possible.
Product details:
- Edition number 1990
- Publisher Springer Berlin Heidelberg
- Date of Publication 10 July 1990
- Number of Volumes 1 pieces, Book
- ISBN 9783540526643
- Binding Paperback
- No. of pages237 pages
- Size 242x170 mm
- Weight 820 g
- Language English
- Illustrations XI, 237 p. 0
Categories
Long description:
"Project planning, scheduling, and control are regularly used in business and the service sector of an economy to accomplish outcomes with limited resources under critical time constraints. To aid in solving these problems, network-based planning methods have been developed that now exist in a wide variety of forms, cf. Elmaghraby (1977) and Moder et al. (1983). The so-called ""classical"" project networks, which are used in the network techniques CPM and PERT and which represent acyclic weighted directed graphs, are able to describe only projects whose evolution in time is uniquely specified in advance. Here every event of the project is realized exactly once during a single project execution and it is not possible to return to activities previously carried out (that is, no feedback is permitted). Many practical projects, however, do not meet those conditions. Consider, for example, a production process where some parts produced by a machine may be poorly manufactured. If an inspection shows that a part does not conform to certain specifications, it must be repaired or replaced by a new item. This means that we have to return to a preceding stage of the production process. In other words, there is feedback. Note that the result of the inspection is that a certain percentage of the parts tested do not conform. That is, there is a positive probability (strictly less than 1) that any part is defective. This book presents the state of the art of temporal analysis and cost minimization of projects, as well as project planning under limited resources where the projects are modelled by GERT networks. Basic concepts are summarized and the book is self-contained."
MoreTable of Contents:
1 Basic Concepts.- 1.1 Directed Graphs and Project Networks.- 1.2 GERT Networks.- 1.3 Assumptions and Structural Problems.- 1.4 Complete and GERT Subnetworks.- 2 Temporal Analysis of GERT Networks.- 2.1 Activation Functions and Activation Distributions.- 2.2 Evaluation of Admissible GERT Networks.- 2.3 Computation of Some Quantities Important to Time Planning.- 2.4 Evaluation Methods for Admissible GERT Networks.- 3 STEOR Networks and EOR Networks.- 3.1 Markov Chains and Markov Renewal Processes.- 3.2 STEOR Networks and Markov Renewal Processes.- 3.3 Basic Properties of Admissible EOR Networks.- 3.4 Coverings of Admissible EOR Networks.- 3.5 Properties and Computation of Activation Functions and Activation Numbers.- 3.6 The MRP Method.- 4 Reducible GERT Networks.- 4.1 STEOR—Reducible Subnetworks.- 4.2 Cycle Reduction.- 4.3 Nodes Which Belong Together.- 4.4 Basic Element Structures.- 4.5 BES Networks.- 4.6 Evaluation Methods for BES Networks and General Admissible GERT Networks.- 5 Scheduling with GERT Precedence Constraints.- 5.1 Deterministic Single—Machine Scheduling.- 5.2 Stochastic Single—Machine Scheduling with GERT Precedence Constraints: Basic Concepts.- 5.3 Stochastic Single—Machine Scheduling with GERT Precedence Constraints: Optimality Criteria and Complexity.- 5.4 List Schedules and Sequences of Activity Executions.- 5.5 Minimum Flow—Time Scheduling in FOR Networks.- 5.6 A Flow—Time Scheduling Example.- 5.7 Minimizing the Maximum Expected Lateness in FOR Networks.- 5.8 Essential Histories and Scheduling Policies for Min—Sum Problems in General GERT Networks.- 5.9 Elements of Dynamic Programming.- 5.10 Determination of an Optimal Scheduling Policy for the General Min—Sum Problem.- 6 Cost Minimization for STEOR and FOR Networks.- 6.1 STEORNetworks with Time—Dependent Arc Weights.- 6.2 Cost Minimization in STEOR Networks: Basic Concepts.- 6.3 A Dynamic Programming Approach.- 6.4 The Value—Iteration and Policy—Iteration Techniques.- 7 Cost and Time Minimization for Decision Project Networks.- 7.1 Decision Project Networks.- 7.2 Cost Minimization.- 7.3 Randomized Actions.- 7.4 Multiple Executions of Projects.- 7.5 Time Minimization.- References.