• Contact

  • Newsletter

  • About us

  • Delivery options

  • Prospero Book Market Podcast

  • Managed Pressure Drilling: Modeling, Strategy and Planning

    Managed Pressure Drilling by C Chin, Wilson;

    Modeling, Strategy and Planning

      • GET 10% OFF

      • The discount is only available for 'Alert of Favourite Topics' newsletter recipients.
      • Publisher's listprice EUR 90.95
      • The price is estimated because at the time of ordering we do not know what conversion rates will apply to HUF / product currency when the book arrives. In case HUF is weaker, the price increases slightly, in case HUF is stronger, the price goes lower slightly.

        37 721 Ft (35 925 Ft + 5% VAT)
      • Discount 10% (cc. 3 772 Ft off)
      • Discounted price 33 949 Ft (32 333 Ft + 5% VAT)

    37 721 Ft

    db

    Availability

    printed on demand

    Why don't you give exact delivery time?

    Delivery time is estimated on our previous experiences. We give estimations only, because we order from outside Hungary, and the delivery time mainly depends on how quickly the publisher supplies the book. Faster or slower deliveries both happen, but we do our best to supply as quickly as possible.

    Product details:

    • Publisher Elsevier Science
    • Date of Publication 24 February 2012

    • ISBN 9780123851246
    • Binding Hardback
    • No. of pages408 pages
    • Size 234x190 mm
    • Weight 810 g
    • Language English
    • 0

    Categories

    Long description:

    Managed Pressure Drilling Operations is a significant technology worldwide and beginning to make an impact all over the world. Often reservoir and drilling engineers are faced with the decision on how best to construct a well to exploit zones of interest while seeking to avoid drilling problems that contribute to reservoir damage or cause loss of hole. The decision to pursue a MPD operation is based on the intent of applying the most appropriate technology for the candidate and entails either an acceptance of influx to the surface or avoidance of influx into the wellbore.In today's exploration and production environment, drillers must now drill deeper, faster and into increasingly harsher environments where using conventional methods could be counter-productive at best and impossible at worst. Managed Pressure Drilling (MPD) is rapidly gaining popularity as a way to mitigate risks and costs associated with drilling in harsh environments. If done properly, MPD can improve economics for any well being drilled by reducing a rig's nonproductive time. Written for engineers, drilling managers, design departments, and operations personnel, Managed Pressure Drilling Modeling is based on the author's on experience and offers instruction on planning, designing and executing MPD projects. Compact and readable, the book provides a step by step methods for understanding and solve problems involving variables such as backpressure, variable fluid density, fluid rheology, circulating friction, hole geometry and drillstring diameter. All MPD variations are covered, including Constant Bottomhole Pressure, Pressurized MudCap Drilling and Dual Gradient Drilling. Case histories from actual projects are designed and analyzed using proprietary simulation software online.With this book in hand drilling professionals gain knowledge of the various variations involved in managed pressure drilling operations; understand the safety and operational aspects of a managed pressure drilling project; and be able to make an informed selection of all equipment required to carry out a managed pressure drilling operation.

    More

    Table of Contents:

    1. Fluid Mechanics Challenges and Technology Overview2. General Theory and Physical Model Formulation3. Numerical Analysis and Algorithm Development Strategies4. Steady, Two-Dimensional, non-Newtonian, Single-Phase, Eccentric Annular Flow5. More Steady Flow Applications6. Transient, Two-Dimensional, Single-Phase Flow Modeling7. Transient Applications: Drillpipe or Casing Reciprocation and Rotation8. Cement and Mud Multiphase Transient Displacements9. Transient, Three-Dimensional, Multiphase Pipe and Annular Flow10. Closing Remarks

    More
    0